APPLICATION PROCESS
• Mix with cement (grey, white or mixture of the
two) in the ratio prescribed.
• Ensure thorough mixing in dry state by rubbing
with both hands.
• Add water slowly while mixing.
• Apply the paste on the floor with a trowel.
• Allow it to dry for a day.
• Submerge the floor under water for 3 days for
proper curing.
DIFFERENT TYPES OF FLOOR
We have got an entire range of floor oxides from
ordinary to the premium for different kinds of
customer preferences.
Reviews
There are no reviews yet.